§ 34-27. Backfilling.


Latest version.
  • All excavation in the roadway shall be replaced by tamping, jetting, backfilling with sand and gravel or other methods approved by the city. The backfill shall be replaced to a level of a minimum of zero (0) inches below and a maximum of three (3) inches above the original roadway elevation and a good riding surface shall result in the roadway.

(Ord. No. 188, § 3)