§ 35-28. Generally.  


Latest version.
  • (a)

    All stormwater management improvements shall be installed by the owner.

    (b)

    All storm sewer systems shall be installed in accordance with the plans and specifications approved by the city engineer.

    (c)

    If improvements are dedicated to the city, the city council will render a final decision as to the size and type of the improvements.

    (d)

    For improvements that are dedicated to the city, no additional fill shall be placed above the system and no structural alterations shall be made to the system after the improvements are accepted for dedication by the city.

    (e)

    Where drainage originates upstream and passes through a subdivision or lot, the owner shall be responsible for all drainage improvements within said subdivision or lot required to handle off-site drainage.

    (f)

    The owner shall be responsible for all drainage improvements of whatever size required to adequately handle drainage originating within a subdivision or lot.

(Ord. No. 2017-10008, § II, 10-26-17)