§ 35-36. Operations & maintenance.


Latest version.
  • An operations and maintenance plan shall be provided with the development submittal. The operations and maintenance plan must clearly identify the person(s) responsible for operation and maintenance of temporary and permanent stormwater controls and drainage facilities to ensure proper and continuous function. The operations and maintenance plan shall include, but is not limited to, the following:

    (1)

    Identifying the person(s) responsible for all tasks in the plan;

    (2)

    Inspections and maintenance requirements;

    (3)

    Maintenance of permanent stormwater controls and drainage facilities during construction;

    (4)

    Cleaning and repair of permanent stormwater controls and drainage facilities before transfer of ownership;

    (5)

    Frequency of inspections for the life of any private permanent structures;

    (6)

    Funding source for long-term maintenance of private structures;

    (7)

    Description of maintenance tasks and frequency of maintenance of private structures;

    (8)

    Property access and safety issues;

    (9)

    Necessary maintenance easements;

    (10)

    Copies of maintenance agreements;

    (11)

    Requirements for testing and disposal of sediments; and

    (12)

    Life span of structures and replacement as needed.

(Ord. No. 2017-10008, § II, 10-26-17)